  • Runoff Line Bottlenecks (Flowline Chokes)

    by

    in

    Functions of runoff line chokes:‏The pressure of the fluid inside the reservoir provides the driving force to push fluids into the well, and in wells with natural flow, to the top of the production pipe to the surface. To maximize the production capacity of each well, the constraints in the runoff line can be minimized.‏However,…

  • Oil Sucker (Rod Pump) – Lifting Method Working Principle

    by

    in

    The oil sucker (rod pump) method is one of the most widely used artificial lift techniques, especially in low-pressure wells. The working principle is simple yet highly effective: A surface unit called a pump jack (beam pump) generates mechanical energy and transfers it downhole through the sucker rod string. At the bottom of the well,…

  • Cementing Calculation

    by

    in

    Cementing: The Unsung Hero of Oil & Gas Production Cementing might not be the most glamorous aspect of oil and gas drilling, but it’s undeniably crucial. What is it? Cementing involves injecting specialized cement slurries into the wellbore to:Isolate zones: Prevent unwanted fluid flow between different formations.Support the casing: Provide structural integrity and protection.Control pressure:…

  • Squeeze Cementing Introduction

    by

    in

    Squeeze cementing is a critical process in the oil and gas industry. It involves injecting a cement slurry through perforations in the casing to create a seal in specific locations, effectively bridging undesired gaps. A common misconception is that the cement penetrates the pores of the rock. However, the cement slurry actually dehydrates against the…

  • From Drilling to Completion-Same Well, Different Dimensions

    by

    in

    They highlight the clear difference between drilling-phase equipment and post-drilling wellhead configuration: During drilling (BOP Stack)Large bore sizesHigh pressure ratings (5K / 10K psi)Multiple rams (Pipe Ram, Blind/Shear Ram)Designed mainly for well control and safety After drilling (Wellhead / Completion phase)Smaller internal diametersCasing-oriented componentsFocus on well integrity, flow control, and future production Same well, same…

  • Nine Tips To Consider Before Doing Cementing Job

    by

    in

    1- Try to minimize the size of the washouts during the drilling process across the intervals to be isolated.2- Centralize the casing. Take into account dogleg severity and hole inclination in centralizer placement. it is a major factor to get a good cement job.3- Circulate hole & condition mud prior to cementing. The mud should…

  • Basic Well Completion Note

    by

    in

    Setting the permanent packer using wire-line:1- Assemble packer and setting tool to wireline2- Run with controlled speed to required depth3- Correlate depth using GR/ casing collar locator (CCL)4-Activate setting tool to set slips and packer as follows:4.1 Send electric current down the cable4.2 Ignite the primer cord which generate high pressure gas4.3 This gas pressure…